Interface StorEdge SESTI View full size

Interface StorEdge SESTI

SolarEdge

Simple and easy to install, the StorEdge interface allows connection between batteries and SolarEdge inverters. This system is also designed to cut the voltage and DC current during installation, maintenance or intervention by the fire brigade.

 

The replenishment time for this product is approximately 11 to 12 months. To know the more precise delivery times, you can contact us by chat, or by email.

More details

More info

Interface StorEdge de SolarEdge

  • Allows connection of selected battery suppliers such as Tesla Powerwall and LG Chem RESU with a SolarEdge inverter
  • Easy installation and connectivity of the SolarEdge battery and meter
  • Connects to the SolarEdge inverter in parallel with the PV chains
  • Can be used to update existing SolarEdge systems
  • Designed to cut off voltage and DC current during installation, maintenance or fire brigade intervention.

Schéma fonctionnement StorEdge

DC BATTERY INPUT
Number of batteries per interface*Up to 2, for double capacity
Maximum input voltageVdc1000
Maximum input currentAcc8,5
DC fuses on plus and minus terminals12 A (field replaceable)
ADDITIONAL FUNCTIONS
Battery communication interfaceRS485
Meter communication interfaceRS485
Battery power supplyYes, 12 V / 53 W
STOREDGE INTERFACE POWER SUPPLY
AC input voltage (nominal)Vac220 / 230
AC input voltage rangeVac184 to 264.5
AC frequency (nominal)Hz50 / 60 ± 5
Maximum AC input currentmy300
INSTALLATION SPECIFICATIONS
Cable gland diameter at AC input / cable section6 to 13 mm / 1 to 2.5 mm2
DC input1 pair MC4
Breakout cable for parallel connection of the photovoltaic system and battery to the inverterMC4 included
Dimensions (h x w x d)mm206.6 x 316 x 117.5
WeightKg3
Minimum and maximum operating temperature°C-20 to +60
Protection factorIP65
InstallationWall mount

* For 2 batteries for double capacity, contact SolarEdge.

Data sheets and documentation

Specifications

Monophasé / TriphaséMonophasé
Nombre de MPPT1 MPPT